Following many years of in-house research, M3 System developed an innovative building design whose load-bearing structure is made of bonded expanded-polystyrene elements reinforced with glass-fibre mesh.

The walls are connected to the foundation by glass-fibre mesh embedded in the external and internal render and anchored in the foundation slab. The mesh wraps the entire building inside and out, reinforcing the bonded elements and creating a highly durable structure. Stability is provided by connecting the structure to a double-reinforced, 18 cm thick concrete foundation slab cast over an insulation layer. The slab is placed on EPS and XPS insulation with a total thickness of 18 cm, while its side surfaces are insulated with 10 cm of XPS.

Cutaway of an M3 System house showing the curved insulated shell and layers of the roof and floor

Cross-section

In cross-section, the building consists of four bonded EPS elements joined to form an inverted U-shaped structure. The walls flow seamlessly into the roof. The roof covering rests on a rigid spatial shell, so there is no conventional roof truss. The roof is finished with coated trapezoidal, flat or tile-profile sheet metal bonded to the EPS surface.

Wall thickness ranges from 30 to 140 cm and increases with height. The connected elements form an arch measuring 6.6 m wide and approximately 4.3 m high externally, and 6 m wide by 3.6 m high internally. The gable wall is built from aerated-concrete blocks and insulated with an additional EPS layer.

Because the house is lightweight compared with conventionally built structures, it can be erected in locations that are difficult to access with traditional construction. The foundation slab accounts for more than 50% of the total structural load, ensuring an even distribution of loads across the ground.

Cross-section drawing of the curved M3 System shell beneath a pitched roof

M3 System designs buildings to an energy-efficient standard. Actual energy demand depends on the design, building envelope, systems, location and use, and should be confirmed by calculations for the specific project.

M3 System technology combines energy-efficient solutions, functionality and modern design. Construction and operating costs depend on the design, floor area, specification, building systems and location, so they are assessed individually for each project.

Find us here!

   

OFFICE
M3System
M3 Sp. z o.o.
6 Biznesowa Street
32-800 Brzesko
Poland

tel. +48 14 686 15 90
fax. +48 14 666 39 78
email: biuro@m3system.pl

Magdalena O’Halloran
+48 609 488 628
magdalena.ohalloran@m3system.pl

Bogusław Pacura
+48 603 449 655
boguslaw.pacura@m3system.pl

M3 System Technology

Following many years of in-house research, M3 System developed an innovative building design whose load-bearing structure is made of bonded expanded-polystyrene elements reinforced with glass-fibre mesh.

The walls are connected to the foundation by glass-fibre mesh embedded in the external and internal render and anchored in the foundation slab. The mesh wraps the entire building inside and out, reinforcing the bonded elements and creating a highly durable structure. Stability is provided by connecting the structure to a double-reinforced, 18 cm thick concrete foundation slab cast over an insulation layer. The slab is placed on EPS and XPS insulation with a total thickness of 18 cm, while its side surfaces are insulated with 10 cm of XPS.

Cutaway of an M3 System house showing the curved insulated shell and layers of the roof and floor
Cross-section drawing of the curved M3 System shell beneath a pitched roof

Cross-section

In cross-section, the building consists of four bonded EPS elements joined to form an inverted U-shaped structure. The walls flow seamlessly into the roof. The roof covering rests on a rigid spatial shell, so there is no conventional roof truss. The roof is finished with coated trapezoidal, flat or tile-profile sheet metal bonded to the EPS surface.

Wall thickness ranges from 30 to 140 cm and increases with height. The connected elements form an arch measuring 6.6 m wide and approximately 4.3 m high externally, and 6 m wide by 3.6 m high internally. The gable wall is built from aerated-concrete blocks and insulated with an additional EPS layer.

Because the house is lightweight compared with conventionally built structures, it can be erected in locations that are difficult to access with traditional construction. The foundation slab accounts for more than 50% of the total structural load, ensuring an even distribution of loads across the ground.

M3 System designs buildings to an energy-efficient standard. Actual energy demand depends on the design, building envelope, systems, location and use, and should be confirmed by calculations for the specific project.

M3 System technology combines energy-efficient solutions, functionality and modern design. Construction and operating costs depend on the design, floor area, specification, building systems and location, so they are assessed individually for each project.

Available layout options

Frequently asked questions about M3 System technology

What is the M3 System structure made from?

The structure uses expanded polystyrene (EPS) elements reinforced with fibreglass mesh. The complete layer build-up, reinforcement and finishes are specified for each individual building design.

Is an EPS-based building durable?

Durability relates to the complete structural system, not to one material in isolation. Performance depends on the design, reinforcement, protective layers and quality of installation. Each project should be assessed against the current technical documentation.

How is fire safety addressed?

Fire resistance applies to the complete wall or roof assembly, not to EPS alone. It depends on the layer build-up and the tested system variant, so the relevant rating must be confirmed in the technical documentation for the specific project.

How are moisture and ventilation managed?

A highly airtight building requires controlled ventilation. The solution, including heat-recovery ventilation where appropriate, is selected for the design, local climate and intended use of the building.

What energy performance can a building achieve?

One assessed M3 System building achieved an EP indicator of 14.84 kWh/m²/year. This result applies to that specific building and is not a guarantee for every project; performance also depends on the design, building services, location and use.

What are the design limitations?

Building geometry, structural spans, ground conditions, local climate and regulatory requirements are assessed individually by the designer. Not every concept can be delivered without adapting the design.

Where can I obtain technical documentation?

The available documentation depends on the system version and project. For current information, certificates and documents relevant to a planned development, contact the M3 System team.

What thermal performance do the walls and roof provide?

In an M3 System home completed in Kraków in 2023, the external walls have a U-value of 0.08 W/(m²·K), against a required value of 0.20, and the roof 0.06, against a required value of 0.15. The windows have U-values from 0.76 to 0.80. These figures come from the energy performance certificate for this building; performance in other projects depends on the design.

How much electricity does such a home use in practice?

In a home of approximately 250 m², the heat pump used 3,787 kWh of electricity throughout 2025 for heating, hot water and cooling in summer. The indoor temperature was maintained at 24°C in winter. This is a reading from one building and excludes other household electricity consumption.

Can cupboards and shelves be mounted on the walls?

Yes. Internal partition walls are built using standard methods, so items are fixed to them as in any other home. External walls require fixings intended for this type of wall assembly, in accordance with the specifications provided by their manufacturer.

How long does it take to build a home using M3 System technology?

The components are manufactured in our factory in a dozen or so days, and the house is erected on the plot in 2 days. We usually reach an enclosed, developer-finished stage after approximately 3 months from the start of work on the plot. This period does not include planning permission, utility connections or interior finishing.